Beijing Zulin Formwork & Scaffolding Co., Ltd.

Beijing Zulin Formwork & Scaffolding Co., Ltd. ---Formwork and scaffolding solution

Manufacturer from China
Verified Supplier
14 Years
Home / Products / Self Climbing Formwork /

High active steady Auto Self Climbing Formwork (ZPM-100) for saving the labor

Contact Now
Beijing Zulin Formwork & Scaffolding Co., Ltd.
Visit Website
City:beijing
Province/State:beijing
Country/Region:china
Contact Person:MsBritney Yuan
Contact Now

High active steady Auto Self Climbing Formwork (ZPM-100) for saving the labor

Ask Latest Price
Video Channel
Model Number :ZPM-100
Place of Origin :Beijing, China (Mainland)
Brand Name :ZULIN
Certification :ISO9001-2008
Price :Negotiation
MOQ :One 20ft container
Delivery Time :After deposit 15-20 days
Payment Terms :T/T L/C (bank transfer)
Supply Ability :100sets/day
Packaging Details :In bulk,pallet,bundle or according the customer demand
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

High active steady Auto Self Climbing Formwork (ZPM-100) for saving the labor

Descrition:

Introduction

The lifting power of Auto-climbing Formwork System ZPM-100 comes from the hydraulic system, which includes the oil

cylinder and commutator. The steel rail and the bracket can climb alternately, and therefore the whole formwork system

climbs steadily. Cranes are not needed during the construction. It’s easy to operate,highly active and safe. It’s the best

choice for construction of high buildings and towers.

ZPM-100 Structure Sketch

The Characteristics


1 The system is able to climb as a whole or individually, and in a stable way.
2 As the system climbs by itself and cleaning work is done in situ, tower crane lifts are greatly reduced.
3 It’s safe and convenient to operate, and labor and material costs will be greatly slashed.
4 The bracket will not come back to the ground until the construction is finished. Field spacing will be reduced and

the bumping damages can be almost prevented, especially for the panels.
5 The climbing process is steady, synchronous and safe.
6 All-purpose platforms are provided, and there is no need to set up additional operation platforms, which means

saving the labor and material costs again.
7 There is little margin for error. And if there is, it is simple and easy to correct. Deviations of construction work can

be eliminated floor by floor.
8 Fast climbing speed can be achieved, and the construction cycle will be maintained according to schedule.

Project Application

Project Name:Yongjiang Bridge (Ningbo,China)

Builder:CCCC.First Highway Engineering Bureau

Inquiry Cart 0